04-18-05
Some pics of the air compressor installation.
03-14-04
Annalisa took some great photos of the progress and of me progressing.
02-24-04
A panographic interior shot.
02-17-04
The insulation arrived today! So I got started.
02-08-04
A bunch of pictures to show the progress of a month of work.
01-05-04
Juice!
01-02-04
Service panel installation and a bigger hole in the ground.
01-01-04
A new year and a new steel beam. 
12-29-03
Window work.  Also made no progress on the pipes. 
12-28-03
Dad and Uncle Jim helped me install the garage doors today.
12-19-03
Big day! We arrive home to the great suprise of a new concrete floor!
12-13-03
The garage seems all ready for it's new floor. We are just waiting for warm-ish weather now.
12-07-03
We (Dad and I) finished getting the garage ready to have the new floor poured. The new side door is in!
12-06-03
Sam and Dad came over to help me dig out from under all the snow and to tie the front of the garage down again to the new block.
11-30-03
The cutting was done at the front.
11-28-03
Dad, Jeremy, and Jim helped me (a lot) today. We tied the garage to the new block.
10-23-03
A bigger hole is clear.  I cut a 17 1/2" space between the foundation and wall.
10-19-03
Today was a lot of digging. I cleaned out the 8 inches or so of soil on the outside of the garage as best I could.
10-08-03
Since the chimney was coming apart at the seams... it had to come down.
10-07-03
I worked on levelling the garage. At the moment it is as good as I can make it without more tools.  More tools are soon to be mine!
10-06-03
I pulled off the lower few pieces of siding on two sides of the garage. Found icky stuff.
10-05-03
Dad helped me put the other beam into place. It was easier now that we were old hands at the task.
09-21-03
Dad helped me to put the new center beam into place. It was heavy.
09-14-03
Removing the radiators from upstairs... ugh.
07-27-03
Tearing down the ceiling.
06-28-03
Unearthing the garage.